Preloader

Dubai Safari Park

Project Information

Project Type:

Safari Park

Client Name:

Dubai Municipality

Duration:

30 Days

Materials:

GEWASSER

Dubai Safari Park presents a significant challenge due to its rich biodiversity and diverse array of animals, birds, and fish. Therefore, Natursinn was selected to treat the water surfaces. All materials used in treating the aquatic environments that support fish and plants are natural and free of any chemicals. It was observed that during use, the energy and activity of marine life increased, and the plants improved in health and became more vibrant. This is what distinguishes Natursinn products and consistently places them at the forefront.

Project overview

The main source of desalinated water was also treated, where special devices were installed to restore the water’s original, naturally mimicking shape, leading to continuous and natural improvement in water quality thanks to the water’s frequency engineering.

Main Pipes & Pumps

Checking the best areas to fix Wasser devices